2Morrow Solutions Home Page
2Morrow Solutions Lean Audit
2Morrow Solutions Lean Audit
2Morrow Solutions Lean Management Training
5S Housekeeping & Organisation
Visual Performance Measurement (VPM)
Manufacturing / Operations Strategy
Value Stream & Process Mapping
Methods-Time Measurement
Quality Management Systems
Quality Management Systems
Process Documentation
Facilities Design
Facilities Design
Layout Design Process Page 1
Contract Industrial Engineering
Why Choose Us
Why Choose Us
2Morrow Solutions Testimonial
2Morrow Solutions Brochures
Videos
2Morrow Solutions Blog
Contact Us
Why Use MTM? pg2
Methods-Time Measurement

2Morrow Solutions

Why Use MTM?

Why Use MTM?

By analysing the motions of the fingers, hands, arms and the body, MTM can calculate the time saved (or not saved) by changes to product design, process design and layout design.

How effective is your new layout?

MTM can calculate the time saved in new layout improvements through analysing the number of footsteps, occurrences of bending by the operator or the distance in reach by the operator (e.g. at a workstation).

How can you justify automating a process?

By analysing the current manual process with MTM, the cycle times can be accurately calculated, which can then be compared with cycle times of the proposed automated process.  MTM can be used in comparing different scenarios, including where manual work is required in semi-automated processes.

Call 2Morrow Solutions:

0418 199 063

admin@2morrowsolutions.com.au

Next Page

Previous Page

Make your success in productivity improvement measurable with MTM.

Make Success Measurable